The Manor Expressway (290 Toll) Phase II design-build project upgraded and expanded a 6.2-mile segment from a four-lane divided rural highway to a 12-lane expressway in east Austin in Travis County, Texas. Over the past 25 years, demand along US 290 increased nearly 80 percent. This construction project has helped to relieve congestion, enhance safety and provide a connection between two major highways in the area, US 183 and SH 130, by effectively tripling capacity.

As part of the Central Texas Mobility Constructors (CTMC) joint venture design-build team, Michael Baker coordinated the design and construction of an innovative solution to minimize area traffic congestion while protecting the integrity of the surrounding communities and environment and stimulating local economic development.

The new six-lane expressway is a grade-separated, all-electronic/cashless toll road with three main lanes in each direction. It is located between two newly constructed three general purpose lanes in each direction, which continue to provide non-toll access to commercial and residential properties. New westbound main lanes and frontage roads were constructed in the footprint of the existing roadbed and resulted in shifting the expanded corridor to the south. The project scope of work included the design of 32 bridges, drainage systems and a ten-foot wide, six-mile shared use path for pedestrians and cyclists.

The Manor Expressway project team also emphasized the importance of incorporating sustainable building practices and green elements, including six solar-powered traffic control devices, pavement and topsoil re-use and recycled fill/embankment materials. The team also engaged local contractors, consultants, vendors and suppliers throughout the entire design and construction process.

Within weeks of the project’s grand opening, average weekday transactions soared to nearly 47,000, although the roadway was not projected to hit 41,000 transactions until 2015. This dramatic success raised the Mobility Authority’s overall average weekday transactions system-wide to 170,000 – nearly double the amount from August 2012.

Standard of Excellence

“By addressing key challenges with teamwork and innovation, we were able to deliver this project two months ahead of schedule.”

Don T.
Project Manager

Related Projects

Connect

Connect

Can’t find what you’re looking for? Whether you have a business inquiry, media request or general question or comment, our colleagues are available to assist.

CONTACT US

Change Makers

Change Makers

We Make a Difference. If you’re looking to build your career and make a difference, explore our career opportunities in more than 80 offices across the country. Our corporate culture demands excellence and rewards innovation, teamwork and an impassioned entrepreneurial spirit.

FIND A CAREER